Sample OOM estimate

Conceptual range sample

Order of magnitude estimate for early planning

This sample shows an early-stage planning estimate with a low, expected, and high cost range, plus separate allowances for external works, preliminaries, professional fees, and design-development risk.

Low range excl VATR 2 247 696
Expected range excl VATR 2 718 144
High range excl VATR 3 345 408
Planning sample only. The range narrows as drawings, specification, location, site conditions, procurement route, and market inputs improve.

Project type

Sample residential new-build planning model

Area parameter

180 m2 declared gross building area

Estimate basis

Early-stage conceptual range

Pricing basis

Low / expected / high planning range, excluding VAT

Range summary

Conceptual cost range

All figures exclude VAT unless noted.

Low planning case

R 2 247 696

Lower-side benchmark and allowance position

Expected planning case

R 2 718 144

Current central planning position

High planning case

R 3 345 408

Higher-side range for early uncertainty

Estimate build-up

Allowances by cost component

ComponentBasisLowExpectedHigh
Building worksBenchmark range applied to declared gross building areaR 1 548 000R 1 872 000R 2 304 000
External works allowanceDriveways, drainage connections, and basic external itemsR 154 800R 187 200R 230 400
Preliminaries allowanceProject establishment and time-related construction costsR 170 280R 205 920R 253 440
Professional fees allowanceProfessional team fees and statutory submission allowancesR 187 308R 226 512R 278 784
Design development and risk allowanceScope growth, information gaps, and market movementR 187 308R 226 512R 278 784

Assumptions and exclusions

  • Prepared for early budgeting and option screening from limited project definition.
  • The area is treated as a declared planning parameter; detailed measurement is not part of this sample.
  • External works, preliminaries, professional fees, and risk are shown as separate planning allowances.
  • Rates and allowances are sample planning figures and must be refreshed for project location, date, scope, procurement route, and market conditions.
  • This sample does not replace a developed elemental estimate, trade-led BOQ, live market pricing, or construction contract pricing.